Login
Register
Sunday, September 05, 2010
Web
Site
Search
Home
History
Customers
Customers
Reference List
Ingula (South Africa)
Kef Eddir (Algerie)
Bard (Italia)
Caoria (Italia)
Ridracoli (Italia)
Photo gallery
Products
Valves
Butterfly Valve
Gate Valve
Fixed Cone Valve
Multijet valves
Flap valves
Level Control valves
Inlet Spherical Valve
Gates
Sliding Gate
Wheel Gate
Radial Gate
Flap Gate
Trashrack cleaning machine
Hydraulic mechanisms
Electric control systems
Automation
Seals
Miscellaneous
Quality
Press review
Contact
Bard (Itália) HYDRO-ELECTRIC PLANT
Location
Bard (AO)-Italy
Contract authority
CVA
Amount
900.000 Euro
End of work
: 05/2009
Description
Supply and installation of electromechanical equipment
Weir
N.2 radial gates 20700x2300 mm
N.1 radial gate 20700x1500 mm with overlying flap 20000x500 mm
Gate controls
Hydraulic power unit with stainless steel pipings
Electric control cabinet
PLC for automatic upstream level control
The hydroelectric plant of Bard is situated in the commune of Bard, in the province of Aosta, it is situated on the river auction of the river Dora Baltea
Customers
Reference List
Ingula (South Africa)
Kef Eddir (Algerie)
Bard (Italia)
Caoria (Italia)
Ridracoli (Italia)
Photo gallery
Copyright 2010 by Webbo
Privacy Statement
Calzoni Hydro S.p.a.
40069 Zola Predosa (Bologna) Italia - Via dei Lombardi 3/a - Tel. (+39) 051.751556-Telefax (+39) 051.753629
info@calzonihydro.it
P.I. 02504381209